Back to the article · Use your browser’s Print command to print or save as PDF.
Request equipment-appropriate evidence from qualified personnel. Record completed, not applicable (with reason), or pending. Do not perform internal equipment tests yourself.
Project / room reference: ________________________________ Date: __________________
| Item | Evidence / condition | Result / units | Acceptance criterion | Status / responsible person | Follow-up |
|---|---|---|---|---|---|
| Design assumptions and load calculation | |||||
| Equipment models and matched ratings | |||||
| Included duct / electrical / control scope | |||||
| Airflow: mode, result and criterion | |||||
| Pressure: locations, units and criterion | |||||
| Filter model, dimensions and rating | |||||
| Duct findings and completion checks | |||||
| Applicable refrigerant verification | |||||
| Drainage and overflow protection | |||||
| Applicable heating / venting safety checks | |||||
| Controls and staging demonstration | |||||
| Owner care, manuals and warranty | |||||
| Pending work, owner and follow-up date |
DIY Home Comfort · Scott Harding · Planning aid, not a certification or service procedure.